Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

06/12/2018

...

Development

The weekly meeting takes place on Tuesdays at 15:00 Irish Standard time (UTC)

Meeting is held on zoom:

...

...

...

  • Apologies on the confusion on who would do the work.

  • Thanks for the review

...

https://jira.opnfv.org/browse/BAROMETER-96

  • Additional clarification added / needed

...

https://gerrit.opnfv.org/gerrit/#/c/57807/

  • INTEL_PMU loading issue

...

https://gerrit.opnfv.org/gerrit/#/c/41405/

  • Rename -- Need to check with APEX

...

Did new contributors get added?

  • Yes!

...

Plugfest (Al Morton)

  • ETSI NFVI Testing group might be interested in using Barometer

  • Might use Barometer to collect metrics during API compliance testing

  • Would also like to use fault triggering code from one of the Barometer demos

    • Bring an interface down / up, etc…

06/05/2018

  • DMA team (Tomo) to present a demo of Local Agent collecting OpenStack metadata.

    • One of the features of the DMA project is to collect virtual infrastructure information from OpenStack and make it available to collectd so that metadata can be added to metrics / events.

    • Tomo gave a demo of Local Agent using OpenStack API to gather metadata information for use by Collectd.

  • Development

  • Nomination of new contributors

  • Self Healing Sig

    • Use case templates about DMA project and local healing

    • What about 5 9’s

    • White paper on Barometer’s role in self-healing / availability

    • Originally discussed in Sydney

    • What should be included and what people care about

    • NEC, Verizon, etc…

    • Focus is HA.

  • Go over monitoring paper

    • Go with Confluence Wiki on Barometer home page

  • New dedicated resource for collectd.

    • Ryan McCabe (Red Hat)

05/29/2018

  • Barometer OS Summit

    • Feedback was good

    • Questions

      • Starting to use collectd, Barometer

      • What different plugins available?  Turns out most are already in Barometer

    • Prometheus was mentioned -- Mostly about host to get data into Prometheus from collectd.  Not necessarily replacing collectd.

  • Virt Plugin

    • 3 missing variables.  

    • Added to JIRA

  • Ovs-stats

    • Extended DPDK stats

    • JC to check

  • PMU Plugin Wiki updates

  • Al Morton

    • List of VES metrics meeting this week

    • Going to agree with Al that IPMI are important.  What will we do with those on ETSI side?

    • Give feedback to Al on VES.

  • NFVI Monitoring White Paper

    • Create google doc

    • Start outline

    • Should cover why to monitor specific metrics / conditions, not just these are the things that are available to monitor.

  • Sunku --

    • Had a chat Sando - Paul

    • Call at end of week

    • Self healing Sig

      • List of projects (OPNFV, etc…, )

      • Sunku to e-mail...

05/22/2018

05/08/2018 --

  • Gambia release planning

    • Gambia release will concentrate on maintenance and support of plugins delivered in Fraser release.

    • Need to check on status of ovs-dpdk-stats, ovs-dpdk-events plugins

    • One or two features might be added -- TBD

  • Need code review of container build changes!  Gerrit # -- 53805

  • Standards

  • VES

  • Prometheus

05/01/2018 --

  • Gambia Release -- traditional release

    • Need scenarios and deliverables defined by May 11

  • Gambia Additions

    • More information added to virt plugin?

      • Cpu pinning

      • NUMA node characteristics

      • What to do about (mostly) static information?

    • Additional plugins?

      • May need modification to RAS

        • MCElog might be incomplete

        • Looking at out of band platform hardware

    • Additional containers?

    • Ceilometer replacement?

      • How to get metadata?

  • Need code review of container build changes!  Gerrit # -- 53805

  • Standards

  • VES

  • Prometheus

    • Interest in using Prometheus as polling engine / TSDB

    • Prometheus_collectd_exporter vs. Prometheus_node_exporter

04/24/2018 --

...

Gambia Release

  • Traditional, XCI, both?

    • Not clear on XCI requirements.  

    • When do the tests need to be in place for XCI?

  • What are tentative development goals for the Gambia release?

...

RPMs / Container build

...

j/92950950555?pwd=K2tWZWovWXJWTmNuZHIxNGlZWkpHQT09 and IRC #opnfv-meeting.


Standing agenda items

  • TSC updates
  • CI status
  • Release updates
  • Action item review


Next meeting

The next meeting takes place on , at 15h00 UTC (15h00 Ireland/Dublin).

Agenda

  • TSC updates
    • There are some proposed changes the charter to remove the restrictions on membership composition.
  • CI status
    • stable/moselle container jobs are not building/pushing; seems to be a timing issue, the job ran before the stable/moselle
  • Release updates
  • Action item review

2022 Meetings

04-Oct-22

  • TSC updates
  • CI status
  • Release updates
  • Action item review

20-Sept-22

  • TSC updates
  • CI status
    • Moselle container jobs are failing
  • Release updates
    • M2 has been approved
    • M3 is November 8th
    • There was a brief discussion about having a community release manager instead of a LF staff release manager
      • More details will be shared next week about role/responsibility of a community release manager
  • Action item review
    • (Emma) Check on Moselle job failures

13-Sep-22

  • TSC updates
    • TSC elections are coming up; the active contributors list is available: https://wiki.anuket.io/x/NgLxAQ
    • There will be an election to fill the vacant seat left by Cedric Ollivier; timeline TBD, must be run within 30 days of notification
  • CI status
    • Moselle jobs container jobs are failing.
  • Release updates
    • M2 has been pushed to September 20th
  • Action item review

06-Sep-22

  • TSC updates
  • CI status
    • Moselle container jobs are failing
  • Release updates
    • M2 is scheduled for Sept 13
  • Action item review

16-Aug-22

  • TSC updates
    • A new docs project was proposed; scope needs to be clarified and some questions addressed
    • No stable branches were created for moselle for barometer, vineperf or kuberef; Cedric pointed to the solution, and offered to do the final creation step.
  • CI status
    • Moselle jobs exist but are failing because there is no moselle branch
  • Release updates
  • Action item review

19-Jul-22

  • TSC updates
    • release retrospective took place; mostly regarding docs
  • CI status
    • All jobs are passing
  • Release updates
    • Release cycle starting August 2nd
    • M1 is August 16th
  • Action item review

28-Jun-22

  • TSC updates
    • CFP deadline for ONE summit is July 10th
  • CI status
    • All jobs are passing
  • Release updates
  • Action item review

14-Jun-22

  • TSC updates
  • CI status
    • Jobs seem to be working again
  • Release updates
    • Moselle is almost over; branch cutting and job creation pending
    • Nile kickoff has been pushed out to give people a chance to decompress and deal with any delays in Moselle.
  • Action item review

31-May-22

24-May-2022

  • TSC updates
    • Topics are due for developer event in Porto
    • There will be one virtual-only track
  • Release update
    • Today is M4; no action needed - all high priority items are resolved
    • TSC was asked to approve the milestone; there were no objections
  • Ci status
    • All green, but nothing seems to have run recently; barometer-daily-lakelse has not run for over a month; barometer-daily-master has not run for 2 weeks

03-May-2022

  • CI status
    • All green
  • Release update
    • TSC approved M3 today

26-Apr-2022

  • TSC Updates
  • CI status
    • All is green
  • Release updates
    • M3 was push out by 2 weeks
  • Action item review

19-Apr-2022 (Cancelled)

  • TSC Updates
  • CI status
    • All is green
  • Release updates
    • M3 is April 19th
      • High priority Jira issues resolved (closed or assigned to future release)
      • Preliminary documentation completed (confirmed by DOCs team)
  • Action item review

12-Apr-2022

  • TSC Updates
  • CI status
    • All is green
  • Release updates
  • Action item review

05-Apr-2022

  • TSC Updates
    • Airship project is proposed for archiving
  • CI status
    • Everything is green
  • Release updates
    • M3 is mid-April
  • Action item review

22-Mar-2022

15-Mar-2022

08-Mar-2022

01-Mar-2022

  • TSC updates
  • CI status
  • Release updates
    • Reminder from dmcbride to update documentation on what we're planning to do for the release.
    • Plans should include CentOS Stream
    • TODO(Emma) Update release documentation
  • Action item review

22-Feb-2022

15-Feb-2022

  • TSC updates
    • CLA and gitlab migration are under discussion
  • CI status
    • Looks good
  • Release updates
    • Moselle M2 is mid-March
  • Action item review
    • Emma to update meeting time to 2 hours earlier

07-Feb-2022

  • TSC updates
    • Gitlab migration was discussed
  • CI status
    • Everything is working
  • Release updates
    • Moselle M2 is mid March
  • Action item review
    • Update meeting time – proposed to move it 2 hours earlier

25-Jan-2022

18-Jan-2022

  • Release updates
    • Moselle is kicking off
  • CI status
    • All are green!
  • TSC updates
  • Standards updates

11-Jan-2022

  • cancelled

04-Jan-2022

  • Release updates
    • Tasks complete for Lakelse M5
  • CI status
    • All green, and Lakelse jobs are up
  • TSC updates
  • Standards updates

2021 Meetings

14-December-2021

  • Lakelse updates
    • exception approved for barometer m5 until December 17th
  • CI status
    • All green!
  • TSC updates
  • Standards updates

07-December-2021

30-November-2021

  • Lakelse Updates
    • TSC approved M4
  • CI status
    • Everything is passing!
  • TSC updates
  • Standards updates
    • The TST008 update is that the ETSI Editors contacted Al today to say that their editing process (on the approved text) has begun.

23-November-2021

  • Lakelse Updates
    • Release will be early next year
  • CI status
    • Everything is passing!
  • TSC updates
  • Standards updates
    • No comment; remote consensus process closed; Document number updated to NFV(21)000243, and it's now considered "done"; expected actions from editors to update style and references;

16-November-2021

  • Lakelse Updates
    • M4 is up today, which applies to specification projects
    • There was a discussion on moving the release schedule so Lakelse finishes later
  • CI status
    • Everything is passing
  • TSC updates
  • Standards updates

09-November-2021

...

Standards

  • All the info we’re collecting will end up in analytic engines

    • Analytics processing tasks need info all the way down to the agent layer

    • Need to make sure there’s a measurement timestamp to provide context

  • Does test008 spec have the flexibility to talk about measurement of network interface using a particular VLAN tag?

    • Yes, scope parameter makes that possible

    • Scope must be conveyed with the measurements

...

VES

  • 6.0 specs on the way (next week)

    • Multi-VM reqs

...

Compass support -- not for Gambia or Fraser?

  • Barometer will be supported in Gambia

...

HA scenario issues with build

  • A problem with OOO?

  • Fails every third build or so.

  • Will be looked at soon (next week)

...

Edge Cloud

  • Requirements

    • Categories

    • Use cases

  • Latency

    • Use cases where latency is critical

    • Example feedback loop?

  • What does lightweight mean in the context of edge telemetry?

04/17/2018 --

  • Spoke with DMA project team.  They are ok with working in a separate container.  They will swing back in a few weeks with a demo.

  • Standards with Al Morton

    • No updates

  • VES with Bryan Sullivan

    • Most work done by Goku

    • Bryan will update VES for latest release to make sure it works with everything

    • Plan is place to move items forward in Barometer

  • RPMs with Leif

    • Making progress

  • Func tests

    • Will not support Compass this cycle

  • Collectd pull requests

  • Release

    • Gambia path or something else?

    • Which track do we follow?

    • Continuous delivery

      • Flexibility with milestones, since you establish them yourself?

      • Bryan doesn’t think we should do traditional path -- not enough resources

      • FCI could be a good thing if it marries VES and Barometer

  • Edge Cloud

    • What are the requirements?

      • Need categories

      • Always about latency for faults and metrics

      • Framework and edge computing use cases would be good

    • Is VES a good fit?

      • Good for cloud-native

      • What is a cloud?  What value does opensource ecosystem get from:

        • Common telemetry date model

        • Consistent set of mechanisms by which data delivered to collector

    • How lightweight?

      • Less than 1% CPU, and 5% memory

      • Two VES encodings: C and Java

      • Goku: tokenized VES data structure

      • Overhead of data and complexity of stack

      • Go from binary XML to tokenized JSON

      • Current implementation is not lightweight but is “easy”

      • Use gzip, as it is natively available to HTTP stack (works out of box)

04/10/18 --

  • DMA Project discussion

    • Positive feedback on DMA proposal.  Want to move forward.

    • Work should be done in a separate container.

  • Standards

    • Al has been reviewing Alok’s VES proposals.  Found some VMWare specific items. Vendor-specific provisions are discouraged.  Al to talk with Alok ;).

    • VES is starting to incorporate some TOSCA information.

  • Collectd

    • Emma suggested that all collectd PRs be from the same fork, Barometer, in order to make collectd aware of who the reviews are for.

    • Also, should have more Red Hat people reviewing collectd.  Need to talk with local Red Hatters.

  • VES

    • Bryan returned.  Wants to keep the VES agent development moving forward.  Did not know about DDS messaging stuff in ONAP. However, see’s that Kafka is not set in stone.  What to do at the edge.

  • General

    • Next week I will be out.  Andrew Bays will run meeting.

04/03/18 --

...

DMA Project

...

Presentation given by Tomofumi Hayashi.  Slides available on the wiki.

...

Major takeaways…

  • Run time reconfiguration of collectd.  There were some questions as to whether this should be a feature of something like an Ansible playbook.

  • Topology annotation.  Questions about security and what information would be included.  It was stated that only infrastructure information would be annotated.  

  • Data reduction and analysis at the edge.

  • DMA project should be an add-on.  Might need to be able to “unwind” project in the future.

02-November-2021

26-October-2021

19-October-2021

12-October-2021

05-October-2021

  • Lakelse update
    • M3 is October 19th
  • CI status
    • Everything is passing
  • TSC Updates
    • Nominations are open for the 2022 TSC memberships
  • Standards updates
    • No updates; latest meeting was post-poned
  • Committer clean-up
    • Process for removing committers:- either a committer steps down voluntarily or can be removed by a 2/3 majority vote.
    • Action(Emma) Reach out to Calin about stepping down

28-September-2021

  • Lakelse update
  • CI status
  • TSC Updates
    • Nominations are open for the 2022 TSC memberships
  • Standards updates
    • A complete working group review of the document is happening, then it will be submitted for full approval.
  • Committer clean-up
    • Emma did not check the existing process
    • Emma e-mailed Aaron about stepping down as a committer - he agreed
    • Al e-mailed Maryam about stepping down as committer - she sadly agreed
    • Action(Emma): Check the existing process for removing committers;
    • Action(Emma) Reach out to Calin about stepping down

21-September-2021

31-August-2021

  • Lakelse updates
    • Today is M2 - scope freeze
  • CI status
  • Standards updates
    • The ETSI-NFV test working group accepted the contribution on storage!
  • AoB

24-August-2021

  • Lakelse updates
    • Need to add Lakelse labels to Jira items
  • CI status
  • Standards updates
    • Updated draft of TST-008 to include storage metrics
  • AoB

17-August-2021

  • Lakelse updates:
    • M2 (scope freeze) is  
    • Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 2 weeks.
  • Ci status
    • No status change
  • Standards updates
    • no status change
  • AoB

10-August-2021

  • Lakelse updates:
    • M2 (scope freeze) is  
    • Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 3 weeks.
  • Ci status
    • Everything looks fine (some older jobs are failing, but that's nothing to worry about)
  • Standards updates
    • No updates
  • AoB

03-August-2021

  • Lakelse updates:
    • M2 (scope freeze) is  
    • Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 4 weeks.
  • Ci status
    • barometer-daily-master is working again!
  • Thoth, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
    • Thoth project got approved at this week's TSC!
  • AoB

13-Jul-2021

  • Announcement: Meetings are cancelled the next two weeks for vacation time
  • Lakelse updates:
    • M2 (scope freeze) is  
  • Ci status: barometer-daily-master is mostly working; there's an issue in uploading the artifacts, I've logged a ticket to get it investigated.
  • Gitlab transition:
    • ETA is mid-August
  • AI/ML project, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
  • AoB

06-Jul-2021

Older meetings






Table of Contents

...

Development

  • Thanks to Emma for updating the docs and helping track down Funtest issues

  • Still seeing an error with Functest… seems to be related to Functest, not Barometer.  Emma tracked down the internal Barometer issues!

  • Barometer container -> multistage build from RPMs progressing slowly..

...

ONS recap

03/20/18 --

  • Made MS6...

  • Next upcoming milestone, MS7, April 6th -- last day to request a stable branch.  Can request one anytime until then.

  • After than MS8, April 16, completion of testing

  • Current Fraser status

    • api_check failing

      • test_add_remove_volume

      • test_attach_volume_nowait

      • test_detach_volume_nowait

      • ….

      • Perhaps it was a system / connectivity failure?

    • Emma good catch on Hugepages failing fix

    • Gnocchi failures

      • Results not appearing quickly enough due to Gnocchi archive policy

      • Change default policy to High

    • AODH failures

      • Need to modify the tests to perform specific failure action

  • REDFISH Plugin

    • Purpose  -- node or rack?

    • Design review

  • Standards Update

  • VES Updates

    • Progress on ETSI?

    • VES Mobile edge platforms?

    • Is there a cadvisor plugin for collectd?

    • C, Java VES libraries

    • Microservice heatbeat

      • ONAP flow

      • Vendor VNF

      • Closed loop control

      • Services goes into VNF

      • Any missing heatheats

      • At the FM layer

03/13/18 --

  • Functest debug and then power loss ;(

03/06/18 --

  • Milestone 5 complete

    • Scenario deployment passed

    • Functest failing

  • MS6 03/16/18

    • Test case implementation completed.

    • Preliminary documentation completed.

    • First day that projects may request creation of the stable branch for their project.

  • APEX

    • Functests failing

    • Virtual deploy -- RDT, Hugepages…  Should we skip during virtual deploy?

    • APEX deployment help -- Aaron has a test setup running and can answer questions.

  • Collectd

  • DMA project would like to have another meeting (possibly at ONS)

  • Did you get your feedback to Alok?  I know I didn’t yet :(.

    • Want to get comments by the 15th

    • Produce a spec update by end of March

    • Have a weekly update

  • VES Update

    • VES Project into ETSI

    • Parts of the project, metric / event definitions, transport

    • Pair things down to what’s important

    • 10’s of collectors at present

  • VES mobile edge platforms

    • CAdvisor plugin for collectd?

    • Maybe try in the Barometer container?

02/27/18 --

  • Milestone 5 approaching

    • Thanks for the help on Apex and Barometer

    • Tracked down issue with deploy

  • Standards Update

  • VES Update

  • Barometer containers to be part of RDO release

    • Team to work on building Kolla containers

    • AMQP1.0 container being built

02/20/18 --

  • Collectd on Cumulus

    • Open Compute / Networking

  • Standards Updates?

  • VES Updates?

  • Development

    • Apex scenarios are currently failing

    • Ansible script reviews in progress

    • MS5 approaching

  • Barometer next?

02/13/18 --

...

Should Barometer Graduate? (https://www.opnfv.org/software/technical-project-governance/project-lifecycle)

  • Are we a part of enough scenarios (another installer)?

  • Would be a good recognition of the work done by Barometer

  • Have had good recognition at shows (OpenStack Summit, OPNFV, etc)

  • Bryan would be supportive of applying for graduation

  • No definitive answer, but positive reception

...

Standards Update (Al)

  • Meeting with IFA working group completed work on all measurement content.  Al provided an edit / rewrite of the document and resubmitted.

  • Discussion of GAPs in Baromter

...

VES Update

  • Bryan working on Barometer Kubernetes scenario.  Should be ready soon. Barometer as DaemonSet

  • Conversion of VES to gRPC in the testing phase.

...

Development Update

  • Ansible scripts submitted to Gerrit

  • Clarification that plugins not in collectd yet should still make it into Barometer / Fraser

...

(MS5) Scenario integration and feature freeze -- 03/02/18

...

Good discussion on “What’s next for Barometer”

  • Scope expansion -- Should Barometer move beyond metrics / events to policy

  • Scope continuation into container space --

...

OPNFV Barometer people going to ONS in March

...

Aaron

...

Al

...

Bryan

...