Attendees
- Walter Kozlowski (Telstra)
- Al Morton (AT&T)
- Cedric Ollivier (Orange)
- Sridhar RaoEmma Foley (SpirentRed Hat)
- Frank Brockners (Cisco)Gergely Csatari (Nokia
- Jie Niu (China Mobile)
- Walter KozlowskiGeorg Kunz (TelstraEricsson)
- Emma FoleySridhar Rao (Red HatSpirent)
- Lincoln LavoieGergely Csatari (UNH-IOLNokia)
- Saad Alqahtani as proxy for Ahmed El Sawaf
Absent (TSC)
- Lincoln Lavoie (UNH-IOL)
- Riccardo Gasparetto Stori (Vodafone
- Riccardo Gasparetto Stori (Vodafone)
- Jie Niu (China Mobile)
- Georg Kunz (Ericsson)
- Trevor Cooper (Intel)
- Mark Beierl (Canonical)
- Beth Cohen (Verizon)
Absent (TSC)
Proxy Allocations
- TSC AGREED to have Saad Alqahtani serve as proxy for Ahmed El Sawaf for a duration of 6 weeks (until Sept 14).
...
- Scot Steele (Microsoft)
- David McBride(LFN)Sandra Jackson (LFN)
- Karine SevillaPankaj Goyal (OrangeMicrosoft)
- Parth Yadav(University of Delhi)Ildiko Vancsa(OIF)
Agenda
Time | Topic | Presenters | Notes |
---|---|---|---|
5 min |
|
|
|
|
|
|
|
| |
5 min | Announcements
|
|
|
5 min |
|
| |
5 min |
|
|
15 min | Release Updates
|
No news on Anuket Assured marketing. Will be announcing this at the ONES Summit. Request for a company to spot light a product/service that is certified.
The long gap to M2 - Scope freeze is about to end. Status:
RA review
Summary: given a limited amount of time, and the fact that RA1 has not changed much since last fall when it was reviewed, the team chose to focus their attention on RA2. This resulted in the generation of several GitHub issues.
Status: Done
RC readiness
Summary: this requires the RC workstream leads to make a statement to the TSC that each RC is ready for validation testing. The latest developments will be included in the testing. RC1 is synced with RA1 and tested in CI at Walliby Release
RC2 is continuously tested, but would like to include the next stable release for K8s (1.22? ). The current schedule does not reflect this dependency.
WSL asserts that RC1 and RC2 are ready for testing
Status: Open
RC Coverage
Summary: this requires the RC workstream leads to provide to the TSC a mapping of test cases to RA requirements.
Status: Open
Jira Issues Assigned to Release
Summary: this task requires that each software project document the work that they described in their project plan as a set of Jira issues. Currently, only ViNePerf and Barometer show any issues assigned to Lakelse. Kubref has also assigned issues to Lakelese.
Parth Yadav is PTL for CIRV and plans to release in Lakelese.
Status: Open
High Level Issues Listed on Specification Dashboard
Summary: this task requires that the specification team list the high level issues on the dashboard.
Status: Open Who will update this? WSLs
Completion looks like:
- All issues have numbers, and otherwise updated so it is clear what is in-scope and what issues are not.
Topics for the next Tech Discussion:
- RTD first!
- Validation testing
- Traceability
X-testing is part of Functest, maintained there as well.
|
0 |
min |
|
- Feedback from (re-)introduction of Anuket Assured to EUAG
- Met with the EUAG and re-introduced the re-branded Anuket Assured program
- Major action item was an agreement to re-visit and update the EUAG testing whitepaper
- Slides from meeting
5 min |
|
|
10 min |
|
Walter Kozlowski and sub-project Leaders |
- RM: meeting tomorrow to finalise the Lakelse list of GitHub issues; main topics around multi-cloud infra, security and storage, and alignment with RA-2 reg HW acceleration and Networking
- ViNePERF: Testing for including RC2 test cases in X-testing - all in-line
- Functest Kubernetes v1.22 will be announced soon
- CIRV progress: CIRV-SDV Lakelse Release Plan
- ViNePERF: Testing for X-testing - all in-line
5 min |
|
Deferred to next week.
5 min |
| ||
5 min |
|
AOB
- Discuss open ideas about the structure and topics of the TSC meetings in the future
0 min | AOB |
Seat vacated - Discuss on TSC.